| Description |
| As a collector street, this roadway provides access for vehicles and pedestrians to and from a residential neighborhood. To improve the roadway and enhance safety, this project will include rebuilding the roadway, enclosing ditches, adding curb & gutter, and sidewalk/bike lanes on both sides of the road. |
| Type |
| II - Reconstruction of neighborhood collector streets |
| |
| Preliminary Cost Estimate |
| Design |
$420,000.00 |
| Right of Way |
$580,000.00 |
| Construction |
$2,100,000.00 |
| Utility Relocation |
$532,600.00 |
|
| Total |
$3,632,600.00 |
|


 |