| Description |
| This project is a high priority within the Southside Revitalization strategy, the South Monroe Sector Plan, and the Providence Renaissance Neighborhood initiative. It includes rebuilding the roadway, enclosing ditches, adding curb & gutter, and sidewalk/bike lanes on both sides of the road. This project will reduce roadside hazards and provide residents with access to Taltran transit routes 11 & 20, and Pineview Elementary School. |
| Type |
| II - Reconstruction of neighborhood collector streets |
| |
| Preliminary Cost Estimate |
| Design |
$260,000.00 |
| Right of Way |
$440,000.00 |
| Construction |
$1,300,000.00 |
| Utility Relocation |
$369,600.00 |
|
| Total |
$2,369,600.00 |
|


 |