| Description |
| Located within a southeast side neighborhood in the Central Core area, this project includes constructing a sidewalk on one side of the roadway. This will improve pedestrian access to Taltran bus stops along route 26, and will enhance safety when accessing adjacent businesses and residences. |
| Type |
| III - Residential sidewalks |
| |
| Preliminary Cost Estimate |
| Design |
$160,000.00 |
| Right of Way |
N/A |
| Construction |
$740,000.00 |
| Utility Relocation |
$150,000.00 |
|
| Total |
$1,050,000.00 |
|


 |