| Description |
| Originally part of City Traffic Engineering Residential Sidewalk Program, this project consists of constructing a sidewalk along one side of the roadway to enhance safety and improve accessibility for pedestrians within the Orange Blossom Heights community. |
| Type |
| III - Residential sidewalks |
| |
| Preliminary Cost Estimate |
| Design |
$20,000.00 |
| Right of Way |
N/A |
| Construction |
$80,000.00 |
| Utility Relocation |
$32,000.00 |
|
| Total |
$132,000.00 |
|


 |