| Description |
| This project is a high priority within the Southside Revitalization strategy and the South Monroe Sector Plan. It includes rebuilding the roadway, enclosing ditches, adding curb & gutter, and a sidewalk on one side of the road. |
| Type |
| I - Reconstruction of residential streets |
| |
| Preliminary Cost Estimate |
| Design |
$35,000.00 |
| Right of Way |
$35,000.00 |
| Construction |
$175,000.00 |
| Utility Relocation |
$23,500.00 |
|
| Total |
$268,500.00 |
|


 |