| Description |
| This was originally a Mini-Pedestrian And Street Safety (PASS) project. It will consist of rebuilding the roadway, enclosing ditches, adding curb & gutter, and including a sidewalk one side of the road in efforts to enhance safety and improve pedestrian access to North Florida Christian School. |
| Type |
| I - Reconstruction of residential streets |
| |
| Preliminary Cost Estimate |
| Design |
$110,000.00 |
| Right of Way |
$110,000.00 |
| Construction |
$640,000.00 |
| Utility Relocation |
$298,800.00 |
|
| Total |
$1,158,800.00 |
|


 |