| Description |
| This project is a high priority within the Southside Revitalization strategy, the South Monroe Sector Plan, and the Central City initiative. It includes rebuilding the roadway, enclosing ditches, adding curb & gutter, and a sidewalk on one side of the road. |
| Type |
| I - Reconstruction of residential streets |
| |
| Preliminary Cost Estimate |
| Design |
$220,000.00 |
| Right of Way |
$220,000.00 |
| Construction |
$1,100,000.00 |
| Utility Relocation |
$125,000.00 |
|
| Total |
$1,665,000.00 |
|


 |