| Description |
| This project is part of the Southside Revitalization strategy and the South Monroe Sector Plan. It consists of constructing a sidewalk on one side of the roadway to improve pedestrian safety and enhance accessibility. |
| Type |
| III - Residential sidewalks |
| |
| Preliminary Cost Estimate |
| Design |
$25,000.00 |
| Right of Way |
N/A |
| Construction |
$135,000.00 |
| Utility Relocation |
$39,000.00 |
|
| Total |
$199,000.00 |
|


 |