| Description |
| This roadway reconstruction project will improve pedestrian and vehicular safety by enclosing ditches, adding curb & gutter, and installing a sidewalk on one side of the road. |
| Type |
| I - Reconstruction of residential streets |
| |
| Preliminary Cost Estimate |
| Design |
$225,000.00 |
| Right of Way |
$225,000.00 |
| Construction |
$1,130,000.00 |
| Utility Relocation |
$338,200.00 |
|
| Total |
$1,918,200.00 |
|


 |