| Description |
| This project is within the Southside Revitalization strategy and the South Monroe Sector Plan. It consists of constructing a sidewalk along a single side of the roadway. |
| Type |
| III - Residential sidewalks |
| |
| Preliminary Cost Estimate |
| Design |
$30,000.00 |
| Right of Way |
N/A |
| Construction |
$140,000.00 |
| Utility Relocation |
$43,000.00 |
|
| Total |
$213,000.00 |
|


 |