| Description |
| As a collector road providing access to student housing, this project was originally included within the Traffic Engineering Pedestrian And Street Safety (PASS) Program. The proposed project will include reconstructing the roadway, enclosing ditches, adding curb & gutter, and including sidewalk/bike lanes on both sides of the road. |
| Type |
| II - Reconstruction of neighborhood collector streets |
| |
| Preliminary Cost Estimate |
| Design |
$140,000.00 |
| Right of Way |
$260,000.00 |
| Construction |
$700,000.00 |
| Utility Relocation |
$213,000.00 |
|
| Total |
$1,313,000.00 |
|


 |