| Description |
| This project is part of the Southside Revitalization strategy and the South Monroe Sector Plan. This project includes rebuilding the roadways, enclosing the roadside ditches, adding curb & gutter and constructing a sidewalk on one side of the road to improve pedestrian safety and provide access to local businesses and Florida A&M University. |
| Type |
| I - Reconstruction of residential streets |
| |
| Preliminary Cost Estimate |
| Design |
$150,000.00 |
| Right of Way |
$150,000.00 |
| Construction |
$700,000.00 |
| Utility Relocation |
$289,120.00 |
|
| Total |
$1,289,120.00 |
|


 |